PEC T365 PaleFace to Wirtz 138kV Rebuild

PEC T365 PaleFace to Wirtz 138kV Rebuild

PROJECT OVERVIEW /

17 miles of rebuild which includes the installation of (69) new steel structures, bundle 795 "Drake" conductor and OPGW. Removal of existing wood poles, hardware, 336.4 ACSR “Linnet” conductor and 3/8” HS Steel OHGW.

CLIENT /

Pedernales Electric Cooperative, Inc.

LOCATION /

Marble Falls, Texas